Summary: | Report advises that the wall exposed within the trench in the N.W corner of the Bailey should be covered over before facing stones are dislodged. The other, larger, trench exposing the wall adjacent to the top of the quarry needs to be backfilled and that a sample of the accretion attached to wall be taken away for analysis. Once backfilled certain portions of the wall need to be repointed. |
---|