Summary: | Report on pipe laying works. No disturbance to visible features associated with the moated site were observed, but a large back filled feature was noted in pipe trench. This feature was interpreted as the inlet ditch for the moated complex. Anecdotal information from a passer-by stated that the ditch was filled in about 35 years ago. |
---|